Technik membrane switches that survive a million presses — for medical, industrial, and consumer OEMs worldwide.
We make the membrane switches you don’t think about — until they fail. Since 2006, JASPER has tooled, printed, tested, and shipped switches from our Dongguan facility that go onto defibrillators in Frankfurt hospitals, CNC controllers in Stuttgart machine shops, and home appliances in São Paulo. Our work is invisible by design. When a doctor presses “Charge,” when an operator runs a 12-hour shift, when an engineer commissions a control panel — they shouldn’t have to wonder whether the keypad will respond. That’s our job: to make the layer underneath every interaction so quietly reliable nobody notices it’s there.
JASPER by the numbers
Years since founding (2006)
Countries shipped to
m² Dongguan facility
Employees on staff
Switches shipped / year
Q1 2026 field failure
OEMs, die unsere Schalter in ihren Geraeten einsetzen









Twenty years of making the same thing, slightly better, every year.
Hu Zhou
Started the company in 2006 as a marketing division before turning it into a manufacturer through the Fuming acquisition. Twenty years later, he still personally signs off on every new tooling drawing before it goes to the floor.
Direct line for technical quote questions — under four hours, engineer-to-engineer, no sales relay.
Get in touchWhat’s on the floor
5,000 m² in Humen, Dongguan. Printing through final inspection happens here — nothing outsourced.
Twenty years of refining the same eight steps.
Every membrane switch we ship runs through the same eight stages — graphic overlay printing, dome embossing, adhesive lamination, circuit silver-screening, dielectric layering, die-cutting, electrical testing, and packaging.
We don’t try to skip a stage, automate one out, or buy our way past one. We refine. The silk-screen calibration sheet we wrote in 2008 has been revised 47 times. The visual inspection checklist has 23 line items today, up from 9 at the start.
See the floorCertifications & compliance
We re-audit annually. Copies of current certificates are available on request — ask the engineer handling your RFQ.
Material compliance
Standard adhesive, ink, and substrate options meet RoHS and REACH. UL-rated 94V-0 polycarbonate and 94V-2 polyester are available on request for projects that need them. Halogen-free declarations on file.
Where our parts end up
A rough breakdown of the last 12 months of shipments by end-use. Customer names withheld unless we have explicit permission.
Four things we will not change.
Direct
We answer engineer-to-engineer, not through sales relays. Quote questions go to Hu Zhou and come back in under four hours.
Tooled
We own every silk-screen line, die-cutter, and ink-curing oven on the production path. No outside vendors for critical-path steps.
Tested
Every batch passes IEC 60068-2-30 damp-heat cycling and >1M actuation cycling before it leaves the building. Reports filed with PO.
Shipped
96% OTIF (on-time, in-full) over the last 24 months. When we slip, you get the reason and the revised date in the same email.
Built to be your team for the next ten years — not the next quote.
Most membrane switch suppliers compete on price for one PO at a time. We build relationships measured in product life cycles — from first prototype through end-of-life last-time-buy. The OEMs who started with us in 2014 are still with us in 2026.
Innovation that earns its place on the line.
We don’t chase technology trends. We chase customer problems. When a medical OEM needed sub-30 ms tactile feedback for a one-handed defibrillator, we developed a dual-dome stack that hit 18 ms. When an industrial controller needed 50% thinner backlight for a wall-mount unit, we sourced a 0.18 mm side-emitting LED guide.
We hold over a dozen utility patents covering compound tactile feedback structures, ink formulations, and dome geometries — earned from solving customer briefs, not from speculative R&D. Innovation here means: read the problem, find the seven-step solution, document the spec, repeat next month for someone else.
Six reasons OEMs choose us — and stay.
Where to find JASPER
Songgang Ind. Zone, Huaide, Humen,
Dongguan 523927, China
Talk to Hu Zhou.
Send a drawing or sample. Our chief engineer comes back inside one business day with a DFM read — not a sales pitch. Quote, sample, and tooling can be staged in parallel; first article in 12 working days for standard tactile builds.
